How to upgrade the Traefik rock

This guide is for maintainers updating the workload image used by the Traefik charm.

Repositories and images

  • canonical/traefik-rock contains the rock definitions, with one directory per upstream release.

  • ghcr.io/canonical/traefik:dev is published from the rock pull request branch. Use it only for testing.

  • canonical/oci-factory builds and publishes the official image to ubuntu/traefik on Docker Hub from a commit and directory in traefik-rock.

  • canonical/traefik-k8s-operator contains the charm, which uses the official image. A temporary pull request points its traefik-image resource at the dev image for integration testing.

Create the version directory

Replace angle-bracketed placeholders with your values. Commands use shell variables; enter YAML values directly. Set the versions without the v prefix:

OLD_VERSION='<previous-version>'
NEW_VERSION='<new-version>'

Clone the rock repository and create a branch for the new version:

gh repo clone canonical/traefik-rock
cd traefik-rock
git switch -c "rock/$NEW_VERSION"

Copy the previous version directory from the same supported release series into $NEW_VERSION. Keep $OLD_VERSION unchanged:

cp -r "$OLD_VERSION" "$NEW_VERSION"

Update the rock definition

Replace the placeholders below with your target release and the Go/Node versions required upstream. Preserve the rest of the copied rockcraft.yaml:

name: traefik
version: "<new-version>"

parts:
  traefik-frontend:
    source-tag: "v<new-version>"
    build-snaps:
      - node/<node-version>/stable

  traefik:
    source-tag: "v<new-version>"
    build-snaps:
      - go/<go-version>/stable
    build-environment:
      - TRAEFIK_VERSION: "v<new-version>"

Compare the new directory with the previous one to confirm the intended changes:

diff -ru "$OLD_VERSION" "$NEW_VERSION"

Open and test the rock pull request

Commit the new directory and open a pull request against main:

git add "$NEW_VERSION"
git commit -m "chore: Add $NEW_VERSION"
git push -u origin "rock/$NEW_VERSION"
gh pr create --title "chore: Add $NEW_VERSION" --fill

The Pull Requests workflow packs and tests the rock on amd64, arm64, and s390x, then runs the goss checks. Wait for the workflow to pass. See traefik-rock PR #106 for an example.

Do not merge or close the pull request yet. The next step publishes a dev image from this branch.

Publish the dev image

In the GitHub UI, open Actions > Publish rock to GHCR:dev > Run workflow. Leave Use workflow from set to main, and set the separate Branch to build from input to the rock pull request branch created above. Use workflow from selects the workflow definition; Branch to build from selects the rock sources. Then run the workflow.

The equivalent command is:

gh workflow run rock-release-dev.yaml --repo canonical/traefik-rock --ref main -f "branch=rock/$NEW_VERSION"

Run the workflow before merging or closing the rock pull request: it detects version directories changed relative to main and publishes them to ghcr.io/canonical/traefik:dev.

Wait for the workflow to finish, then confirm that the assemble-and-publish job succeeded rather than being skipped. See the example dev publish run.

Test the dev image with the charm

Open a temporary pull request in the charm repository that points the traefik-image resource at the dev image. Run these commands from your workspace directory, outside the rock repository:

gh repo clone canonical/traefik-k8s-operator
cd traefik-k8s-operator
git switch -c "test-traefik-$NEW_VERSION-dev"

In metadata.yaml, change only resources.traefik-image.upstream-source to ghcr.io/canonical/traefik:dev. Commit the edit and open the test pull request:

git add metadata.yaml
git commit -m "test: use traefik dev rock for $NEW_VERSION"
git push -u origin "test-traefik-$NEW_VERSION-dev"
gh pr create --title "[DO NOT MERGE] test traefik-rock $NEW_VERSION" --fill

Do not merge the test pull request. The test change points the charm at the dev image, which is not suitable for a release.

Wait for the full integration test matrix to pass. See traefik-k8s-operator PR #809 for an example. If tests fail, fix the rock, publish a new dev image, and rerun the integration tests.

Merge the rock pull request

After the rock pull request workflow and the charm integration tests pass, merge the rock pull request into main.

Return to the rock repository and record the merge commit SHA. OCI Factory uses that commit to find the version directory. Use the merge commit shown on the pull request, rather than a later unrelated commit on main:

git switch main
git pull
ROCK_PR_NUMBER='<rock-pr-number>'
gh pr view "$ROCK_PR_NUMBER" --json mergeCommit --jq '.mergeCommit.oid'

Promote through OCI Factory

Open a pull request in canonical/oci-factory manually. From your workspace directory, clone the repository and create a branch:

gh repo clone canonical/oci-factory
cd oci-factory
git switch -c "chore/add-traefik-$NEW_VERSION"

Update the existing entry in oci/traefik/image.yaml to use the merge commit and new version directory. Keep the release track and risk used by the charm. See OCI Factory PR #1335 for an example:

version: 2
upload:
  - source: canonical/traefik-rock
    commit: "<merge-commit-sha>"
    directory: "<new-version>"
    release:
      <release-track>:
        end-of-life: "<end-of-life-timestamp>"
        risks:
          - "<risk>"

Review these fields:

  • Set commit and directory to the new rock commit and version directory.

  • Keep the existing release track and risk unchanged. The release track does not include the image tag’s risk suffix.

  • Set end-of-life to no more than one year after the release date. Use the longest period that OCI Factory CI accepts, but never more than one year. Set the timestamp in UTC using YYYY-MM-DDT00:00:00Z format.

  • Remove the previous ignored-vulnerabilities entries so the new image is scanned without inherited exceptions. Omit the field when no exceptions are needed.

If OCI Factory reports vulnerabilities that you cannot fix in this upgrade, discuss the severity and impact with the official Traefik rock maintainers before adding them to ignored-vulnerabilities. Request a maintainer review on your pull request or reach out in the public charm-development Matrix room.

Add entries temporarily and include the CVE, package, CVSS score, Ubuntu priority, status, and link. See OCI Factory PR #1177 for an example of adding entries to ignored-vulnerabilities in image.yaml.

Commit and push the change, then open the pull request:

git add oci/traefik/image.yaml
git commit -m "chore: Add traefik $NEW_VERSION"
git push -u origin "chore/add-traefik-$NEW_VERSION"
gh pr create --title "chore: Add traefik $NEW_VERSION" --fill

Check the OCI Factory build and vulnerability scan results. Resolve failures, or obtain maintainer approval for temporary exceptions, before merging.

Finish the charm update

After the OCI Factory pull request merges and the image is published, close the temporary charm test pull request without merging it. Future charm builds use the updated image through the existing tag.